Broan ALLURE QS2 Serie Instrucciones página 3

Ocultar thumbs Ver también para ALLURE QS2 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARE THE HOOD
3
Remove
Teflon
-coated
®
bottom cover
from hood.
Set cover and
mounting screws
aside.
Teflon
®
is a registered
trademark of DuPont.
TEFLON
4
Remove
Damper/Duct
Connector
from inside
the hood. Set
connector
aside - with
mounting
screws and
parts bag.
DAMPER/
DUCT
CONNECTOR
5
Remove either
top or back
wiring knock-
out and install
approved
Electrical
Cable Clamp.
Non-Ducted Installation - Skip to Step 15.
The following
Steps (6 thru
14) are for
DUCTED
INSTALLATION
ONLY.
6
Remove Light Panel - held in place with (3) #8 screws
and (2) #8 screws. Disconnect light assembly wire harness
(white connector).
-COATED BOTTOM COVER
®
(Held in place with 2 screws)
ELECTRICAL CABLE CLAMP
(3) #8 SCREWS
(2) #8 SCREWS
PREPARE THE HOOD
Remove Air
7
Chute - held in
place with one
(1) screw.
NOTE: Be care-
ful not to discon-
nect any wires.
Remove Baffle
8
from air chute.
9
Rotate baffle. Re-
insert baffle into air
chute (as shown) so
that baffle tabs fit all
LIGHT
the way into slots in
PANEL
air chute. An audible
"click" will be heard
when fully installed.
This will close off
the air flow through
the non-ducted slots
on top of hood.
10
Re-install air chute, re-connect wire
harness, and replace light panel.
NOTE: Be careful not to trap wires
between support fin and light panel.
ALLURE
QS2 SERIES
®
RANGE HOOD
AIR CHUTE
BAFFLE
BAFFLE
TABS
SLOTS
SUPPORT FIN
Page 3

Publicidad

Tabla de contenido
loading

Tabla de contenido