Linking Two Machines - NAMCO TIME CRISIS 2 Manual Del Operador

Tabla de contenido

Publicidad

5-5 Linking two Machines

1.
Switch both machines off.
2.
Remove 2off pozi head screws (M5x12) and remove the Link Cover
Bracket.
3.
Fit the Link Cables (supplied) as shown in the following diagram.
4.
Refit the Link Cover Bracket with the 2off pozi head screws (M5x12).
Page 40

Publicidad

Tabla de contenido
loading

Tabla de contenido