6-3-3 I/O Test
1.
Select "I/O TEST" on the menu screen to switches and lamps. The
following screen is displayed.
2.
Use the Select Up/Down switch to choose the required item then press
the Enter button to enter the test.
3.
Select "EXIT" and press the Enter button to return to the menu screen.
DIP 4
LINK
I/O PCB CHECK
GUN INITIALIZE
SWITCH TEST
SOLENOID TEST
EXIT
SELECT SW : CHOOSE
(a) Shows the condition of the DIP Switches on the PCB. In normal operation
all switches are OFF. (If a switch is ON, it will be displayed in red.)
(b) Checks that both game PCBs are communicating.
If the communication is good LINK ON 2 will be displayed
If link data is wrong LINK OFF will be displayed.
If unrecognisable data is being received LINK NG will be displayed.
(c) Checks function of I/O PCB.
(d) Used to test and initialize the gun operation
(e) Selecting this item allows all switches and pedal sensor to be checked.
(See 6-3-3-3 page 50)
(f)
Selecting this item allows the testing of the gun recoil solenoid.
(See 6-3-3-4 page 51)
I/O TEST
12345678 [ON:OFF]
ON 2
ENTER SW : ENTER
Page 47
.............................................. (a)
............................................
............................................
............................................
............................................
............................................
(see Section 6-3-3-2 page 48)
(b)
(c)
(d)
(e)
(f)