Installation Instructions - GUTMANN SOMBRA II Instrucciones De Montaje

Ocultar thumbs Ver también para SOMBRA II:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 44

Installation Instructions

Sombra Ceiling Unit
A Hood body
B Filter insert + glass fronted underside
C Support frame for false ceiling
D Support plate, blank
E Connection nozzle
F Electrical connection
G Suspension points
H Stuffing boxes for supply line
1. Make the necessary preparations for
installation of the hood on site - cover
kitchen appliances, etc.
2. Prepare suitable on-site exhaust air
facilities in the ceiling. Specify the opera-
tor side of the hood on the side with the
control panel.
3. To achieve an optimum extraction
capacity, determine the position of the
extractor hood centrally over the hob
(use a plumb line for help).
en
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

68em6801em

Tabla de contenido