Operation; Initial Start-Up; Setting Up The Charging Station - Heiniger Saphir/G Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
6

Operation

WARNING!
Incorrect operation may cause damage on persons or objects. Therefore:
y Do all the steps of operation according to the indications in this instruc-
tion manual.
6.1

Initial start-up

6.1.1

Setting up the charging station

y Observe all technical data according to the operating conditions (3 Tech-
nical Data).
y The installation surface must be even and must dispose of sufficient sta-
bility and payload.
y The location of installation must be protected against humidity and rain.
y Power outlets in the outer area must be equipped with a residual current
circuit breaker (FI).
y The workplace must dispose of sufficient illumination and ventilation.
y The location of installation must be out of reach of children.
Fig. 10
3. The charging station has electronics that constantly check its functions.
A switchover may therefore last up to 3 seconds.
4. The permanent light of the green LED signalises, that the plug is connect-
ed correctly to the power outlet and the charging station is ready for use.
5. If the battery is very depleted, the charging station wakes the battery.
This may require up to 5 minutes. After that the normal charging process
will start.
Instruction Manual / Small animal clipper
1. Place the charging station on a
firm, even, dry, clean and free
underground.
2. Plug the charging station in the
power outlet.
11

Publicidad

Tabla de contenido
loading

Tabla de contenido