Procedure:
Step 1: Loosen the endcaps and pull them off.
Step 2: Carefully remove the luminaire cover and the neon tube.
Step 3: Carefully remove the metal plate and open the housing.
Step 4: The holes for the installation are on the the inside of the luminaire.
Step 5: Hold the luminaire onto the location where the device is to be installed.
Step 6: Mark the boreholes with a pen or a suitable tool.
Step 7: Drill the holes.
Step 8: Hold the luminaire in the desired position and fix it with the included screws.
Step 9: Replace the metal plate carefully.
Step 10: Install the neon tube and carefully replace the luminaire cover.
Step 11: Ease the endcaps back into position.
Before taking into operation for the first time, the installation has to be approved by an expert!
Connection with the mains
The electric connection must only be carried out by a qualified electrician!
The occupation of the connection-cables is as follows:
Cable
Pin
Brown
Live
Blue
Neutral
Yellow/Green
Earth
The earth has to be connected!
If the device will be directly connected with the local power supply network, a disconnection switch with a
minimum opening of 3 mm at every pole has to be included in the permanent electrical installation.
The device must only be connected with an electric installation carried out in compliance with the IEC-
standards. The electric installation must be equipped with a Residual Current Device (RCD) with a maximum
fault current of 30 mA.
OPERATION
Connect the effect to the mains. With the ON/OFF-switch, you can switch the device on and off.
After you connected the device to the mains, the neon-tube needs 3-4 minutes warm-up time until it reaches
full lighting output.
CLEANING AND MAINTENANCE
DANGER TO LIFE!
DANGER TO LIFE!
International
L
N
DANGER TO LIFE!
Disconnect from mains before starting maintenance operation!
12/23
00028684.DOC Version 1.1