8
Vertical or Horizontal
Ducting Installation
Install Roof or Wall
Cap purchased
separately. Con-
nect the 6" metal
ductwork to the
Roof or Wall Cap
and then attach
ductwork.
10
Slightly widen
the two sides
of the upper
chimney and
hook them
behind the
brackets 7.2.1,
making sure
that they are
well seated.
12
Slightly widen the two
sides of the lower section
and hook them between
the upper section and the
wall, making sure that they
are properly housed.
14
2.1
2.1
2.2
9
Fix the bracket
7.2.1 using the
screws 12a
supplied.
11
12b
N = 4x
Secure the sides to the brackets by using the 4
screws 12b.
13
Fix the the
lower chim-
ney hood
laterally to
the hood
body.
12a
L = 4x
15