Preparing The Ceiling; Electrical Connection; Installation; Fitting The Upper Support Frame - Gaggenau AI 230 700 Manual De Uso

Ocultar thumbs Ver también para AI 230 700:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparing the ceiling

The ceiling must be flat, horizontal and
adequately load-bearing.
The depth of the bore holes must be the same
length as the screws. The wall plugs must have a
secure grip.
The enclosed screws and wall plugs are suitable
for solid brickwork. Suitable fasteners must be
used for other structures (e.g. plasterboard,
porous concrete, poroton bricks).
The max. weight of the extractor hood is

Electrical connection

9
WARNING
Risk of electric shock
Parts inside the appliance can have sharp
edges. The connection cable can be damaged.
Do not bend or pinch connection cables during

installation.

The necessary connection information is located on
the identification plate in the appliance interior,
remove metal grease filter to access it.
Length of the connecting cable: Approx. 1.30 m
This appliance meets EC radio interference
suppression requirements.
9
WARNING
Risk of electric shock
It must always be possible to disconnect the
appliance from the electricity supply. The
appliance must only be connected to a
protective contact socket that has been
installed correctly. If the plug is no longer
accessible following installation of the
appliance, or a fixed connection is required, an
all-pole isolating switch must be present on the
installation side with a contact gap of at least 3
mm. The fixed connection may only be installed
by an electrician.
18
Installation

Fitting the upper support frame

1
Before installation, specify the total height of the
support frame and mark the screw holes.
Note: The height of the support frame can be
adjusted in
2
On the ceiling mark the center point of the
appliance.
50 kg
.
3
Using the enclosed template, mark the positions
for the screws on the ceiling.
4
Drill four
(80 mm) for the attachments and press in the wall
plugs flush with the wall.
5
Attach the upper part of the support frame to the
ceiling with 4 screws.
Note: Ensure that the support frame is in the
correct position. The middle bracket defines the
preferred side and must be facing the control
element for the cooktop.
/
" (20 mm) steps.
3
4
/
" (8 mm) Ø holes to a depth of 3
5
16
/
"
5
32

Publicidad

Tabla de contenido
loading

Tabla de contenido