English
6. START UP INSTRUCTIONS
6.1. LIST OF MATERIALS
This machine includes the following elements which
you will find in the box:
• Shredder.
• Base.
• Wheels.
• Washers.
• Wheel covers.
• Wheel nuts.
• Main axis.
• Catcher
• Instruction manual.
6.2. MOUNTING
Base
1. Insert the main axis
in the base orifices.
Axis
2. Turn the shredder
around leaning the machine
on the hopper.
3. Insert the two base tubes in
the holes of the shredder
body.
4. Mount the wheels onto the main axis as per the
diagram:
Nut
Wheel cover
Wheel
Washer
5. Turn the shredder back around and place on its base.
6.3. CHECKING POINTS PRIOR TO USE
The supply current must be in accordance to
that on the rating label of the machine.
Check the machine and look for loose pieces (nuts,
screws etc) and for damaged parts. Tighten, repair
or replace the pieces that you have found to be in
a bad state. Do not use the machine if damaged or
incorrectly adjusted.
6.3.1. PLACING THE MACHINE
Ensure that you place the machine in a vertical and
stable position. It should not be placed near a wall
and on a floor that is not too hard and where you have
sufficient place to be able to work.
6.3.2. VERIFICATION OF THE BLADES AND THE
HOPPER OF THE SHREDDER
Check that there are no elements inside the shredding
channel and that the blades are correctly installed.
6.3.3. CHECKING THE ELECTRICAL CONNEXION
Verify the connecting base and the cable extension
and ensure that they are in a perfect state and that
they comply with the required normative and the
necessary requirements for this machine.
Check the cable and the cable extension is behind the
machine and clear of the work area.
6.3.4. CHECKING THE OPENING KNOB
Verify the connecting base and the cable extension
and ensure that they are in a perfect state and that
they comply with the required normative and the
necessary requirements for this machine.
28/112