Bradley EFX 60 Thermostatic Mixing Valve with Optional Cabinet
Model S19-2200 Series
Installation Instructions: Valve with Optional Recess-Mounted Cabinet
Note: Flush the supply lines before beginning installation.
1. Rough in a 24-1/2" W x 28-1/2" H hole in the wall for the cabinet (see Figure 3).
2. Measure and mark the cabinet mounting hole locations at the dimensions shown in Figure 3. Install four
1/4" wall anchors, if required (supplied by installer).
3. Insert the cabinet into the wall opening and secure into place with four 1/4" wall fasteners (supplied by
installer).
4. Install two anchors and screws through the valve bracket in back of the cabinet into a secure brace
(supplied by installer) or into the wall. This must be done to provide adequate support for the valve.
5. Install the valve nipples and one-half of the union ball valve using pipe dope or teflon tape. Then install
the other half of the union ball valve onto the inlet and outlet piping.
6. Insert the valve into the bracket in the cabinet (right side of the valve goes in first). Continue with the
valve installation procedure found on page 3.
7. Position the wall flange tight to the wall and caulk in place.
Figure 3
4
FRONT VIEW
BOTTOM VIEW
1/29/07
Installation and Maintenance Instructions
Bradley Corporation • 215-1289 Rev. H; EN 06-909
SIDE VIEW