Installation & Commissioning; Recommended System Layout; Installation Parts - Parker LCMS20/3 Serie Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 83
3 Installation & Commissioning
Only competent personnel trained, qualified, and approved by Parker Hannifin should perform commissioning and service procedures.

3.1 Recommended system layout

A
C
A
Basic Layout
Basic Layout with back up
B
supply
Isolation Valve

3.1.1 Installation Parts

Description
1
Isolation valve
2
3 way ball valve with silencer
3
Flow controller (0-300 ml/min)
4
Flow controller (0-600 ml/min)
5
Flow controller (0-1200 ml/min)
6
Non-return valve
7
1 8 T-piece
8
1 4 Pressure relief valve
9
1 4 NPT Pressure regulator 250 psi g
10
Bottle regulator
11
Bottle connection
12
15.24 m (50 ft) Copper Tube Grade (B-280)
B
D
A
B
C
Cyclical demand
C
(e.g. glove box, fume cupboard)
D
Steady and cyclical demand
Pressure regulator
Non return valve
Flow Controller
Pressure relief valve
Part Number (1 8 )
Part Number (1 4 )
284971556
284971878
284971558
-
-
284971560
284971564
-
-
284971574
284971576
284971867
D
284971578
284971879
284971580
284971604
284971582
284971586
284971588
284971570
284971868
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lcms20/3-0Lcms20/3-1

Tabla de contenido