At the end of the transport process, the suspension (e.g. hook, shackle, etc.) must be lowered
until the load lifting attachment is completely load-free and/or the suspension eye can be
moved freely. The lever can now be switched to the "Open" position again and the load lifting
attachment can be removed from the load.
Zu
close
fermée
NOTE: The latching lever must be moved with care. Lashing of the lever may cause damage
to the toothing of the clamping jaws.
I
/ S
NSPECTION
ERVICE
According to national and international accident prevention and safety regulations hoisting
equipment must be inspected:
• in accordance with the risk assessment of the operating company,
• prior to initial operation,
• before the unit is put into service again following a shut down
• after substantial changes,
• however, at least once per year, by a competent person.
Attention: Actual operating conditions (e.g. operation in galvanizing facilities) can
dictate shorter inspection intervals.
Repair work may only be carried out by specialist workshops that use original TIGRIP spare
parts. The inspection (mainly consisting of a visual inspection and a function check) must
determine that all safety devices are complete and fully operational and cover the condition of
the unit, suspension, equipment and supporting structure with regard to damage, wear,
corrosion or any other alterations.
Initial operation and recurring inspections must be documented (e.g. in the CMCO works
certificate of compliance).
If required, the results of inspections and appropriate repairs must be verified.
Paint damage should be touched up in order to avoid corrosion. All joints and sliding surfaces
should be slightly lubricated. In the case of heavy contamination, the unit must be cleaned.
Auf
open
ouverte
©
2016 Columbus McKinnon Industrial Products GmbH
Zu
close
fermée
17