Installation Of Meter - Brooks Instrument Full-View 1110 Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49
Installation and Operation Manual
X-VA-1110-1140-eng
Part Number: 541B040AAG
September, 2012

2-7 Installation of meter

A. Location
For proper operation of the Full-View flowmeter it must be mounted within
6 degrees of true vertical, with the inlet connection at the bottom of the
meter, and the outlet at the top. The use of a level is recommended to
assure vertical positioning.
B. Piping Arrangement
Installation of a bypass piping arrangement is strongly recommended,
Figure 2-1. Bypass piping permits the meter to be isolated from the flow
line for servicing and cleaning. For more details refer to Brooks T-023
Technical Bulletin Guide for bypass meters.
HORIZONTAL
LINE
FLOWMETER
A
E
A - Inlet Valve
D - Control Valve
Figure 2-1 Typical Bypass Installation
Section 2 Installation
®
Brooks
1110 and 1140 Series
VERTICAL
LINE
FLOWMETER
B
D
C
B - Outlet Valve
E - Drain Valve
D
B
C
A
E
C - Bypass Valve
2-3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Full-view 1140

Tabla de contenido