dirna Bergstrom Bycool Split Instrucciones De Montaje página 20

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SPLIT
EN
PIPING AND CABLE CONNECTION
2- Connect the charging unit gauges and run
empty for at least 30 minutes. Introduce the
oil followed by the R-134 refrigerant gas in
accordance with the following table.
Total pipe
length
6 m
7 m
8 m
9 m
10 m
11 m
12 m
13 m
14 m
15 m
16 m
17 m
Oil cc to be
introduced
20 c.c.
35 c.c.
50 c.c.
65 c.c.
80 c.c.
95 c.c.
110 c.c.
120 c.c.
135 c.c.
150 c.c.
165 c.c.
180 c.c.
20
Air conditioning for vehicles
Gas load to be
introduced
450 grs.
500 grs.
550 grs.
600 grs.
650 grs.

Publicidad

Tabla de contenido
loading

Tabla de contenido