TRGI 2018" of the DVGW German Gas and Water Association valid in Germany.
rules and regulations for the application site must be considered and changed
test criteria (test sequences, pressures and times) must be corrected in the
defaults.
The programs can be aborted at any time with the Esc button (10). Then all
the valves open and the pressure in the installation is released. The tests are
The ambient temperature, the temperature of the test medium and the atmo-
measured pressures. Changes in these parameters must be considered, if
necessary, in the evaluation of the test results.
The pressure test must be repeated if necessary or the installation must be
checked and improved.
NOTICE
NOTICE
The controller ends the control process to set the selected test pressure for
control is ended, e.g. when setting p refer = 150 mbar at a value p actual
between 147 and 153 mbar or when setting p refer = 3 bar between 2.9 and
3.1 bar. This tolerance is safe because, in the pressure test with compressed
air, the relative pressure change of pressure p refer is decisive. If ENTER is
pressed, the value p actual is taken over as p refer. So the test can also be
begun at a p refer of 153 mbar for example.
3.5.1 Load test
1. Test \ Enter
2. Test gas with air \ Enter
3. Load test \ Enter
4. Check reference test pressure default (p refer) and change if necessary
7. Actual test pressure (p actual) is adjusted to reference test pressure (p refer)
\ Enter
8. Stabilisation/wait time (t stabi) running, actual test pressure (p actual) is
changed to reference test pressure (p refer) on expiring. The stabilisation/
wait time can be ended prematurely with Enter, the test time (t test) then
begins immediately (\ Esc = cancel).
9. Display screen: Reference test pressure (p refer), actual test pressure
(p actual), differential test pressure (p diff), test time (t test) \ Enter
10. Esc >> Start menu \ Memory Manager, data transfer >> 3.8
3.5.2 Leak test <100 l
1. Test \ Enter
2. Test gas with air \ Enter
3. Leak test ("Tightness") <100 l \ Enter
4. Check reference test pressure default (p refer) and change if necessary
7. Actual test pressure (p actual) is adjusted to reference test pressure (p refer)
\ Enter
8. Stabilisation/wait time (t stabi) running, actual test pressure (p actual) is
changed to reference test pressure (p refer) on expiring. The stabilisation/
wait time can be ended prematurely with Enter, the test time (t test) then
begins immediately (\ Esc = cancel).
9. Display screen: Reference test pressure (p refer), actual test pressure
(p actual), differential test pressure (p diff), test time (t test) \ Enter
10. Esc >> Start menu \ Memory Manager, data transfer >> 3.8
1. Test \ Enter
2. Test gas with air \ Enter
For further procedure, see leak test <100 l, 4. to 10.
1. Test \ Enter
2. Test gas with air \ Enter
For further procedure, see leak test <100 l, 4. to 10.
Before cleaning and preserving heating systems with REMS Multi-Push, safety
pipe network separator BA in accordance with EN 1717:2000 must be installed
to protect the drinking water against contamination. Never allow cleaner or
The cleaning and preservation procedure is as follows:
mixture with intermittent compressed air (see 3.1.4.). This reinforces the
subsequent cleaning. Pay attention to possible pressure limiting of the
heating system!
Connect the cleaning and preservation unit REMS V-Jet H (Fig. 7), as
described under 2.7. The nozzles installed in REMS V-Jet TW and REMS
V-Jet H for automatic dosing of dosing solution, cleaner and corrosion
protection are different sizes and adapted to the properties of the REMS
ingredients to be injected. Therefore, always make sure that REMS V-Jet
H is connected for cleaning and preserving the heating system.
Remove the locking ring from the cap of the 1 l bottle of REMS CleanH
cleaner for heating systems. Screw the bottle to the cleaning and preser-
vation unit REMS V-Jet H (Fig. 7).
Select program Ingredients \ Cleaning Heating. A drain must be opened at
The bottle may have to be changed to clean heating systems with > approx.
100 l. To do this, close the supply and drain and remove the bottle (21)
slowly so that excess pressure can escape.
The cleaning solution must be drained from the heating pipes again after
an application time of approx. 1 hour.
corrosion protection for preservation of heating systems (program Ingredients
\ Preservation Heating) until the blue coloured corrosion protection solution
protection solution then remains permanently in the heating system.
lations valid for the application site as well as the regulations of the
Flush/clean the REMS V-Jet H thoroughly with clean water at the end of work.
NOTICE
NOTICE
Hoses used for cleaning/preservation should no longer be used for pressure
The pressure is displayed and controlled to the reference test pressure (p refer)
selected on the screen in the range from 200 to 0 descending in hPa (mbar,
psi) and in the range from 0.2 to 8.0 ascending in MPa (bar, psi).
1. Compressed air pump \ Enter
2. Check reference test pressure default (p refer) and change if necessary
(11) \ Enter
3. The vessel is pumped up to the reference test pressure (p refer).
4. Esc >> Start menu \ Memory Manager, data transfer >> 3.8
after connecting the vessel.
The program can be aborted at any time with the Esc button (10). Then all the
valves open and the pressure is released. The pump-up is saved but "Cancel"
Four functions are provided for memory management:
USB lead (Fig. 9 (45)) into the USB port (Fig. 2 (33)).
USB stick at the USB port (Fig. 2 (33)).
Display / Pressure
Customer:
REMS Multi-Push
Save USB
Date:
Hour:
File-No.
Test with water A
p prefer
bar
p actual
bar
p diff
bar
t test
min
Tester:
number in the selected language and can be transferred to a USB stick or
printer (accessory part no. 115604) (neither of which is included in the scope
of supply) for documentation. Necessary additions to saved data, e.g. customer
name, project number, tester, are possible on external devices (e.g. PC, laptop,
tablet PC, smartphone). Paper roll, pack of 5, for printer (Art. No. 090015).
Insert the paper roll and charge the battery before using the printer (Fig. 9 (40)).
repeatedly 3 times. Push back the paper compartment rail (42) to open the
paper roll compartment. Insert the paper roll so that its end is transported from
eng
28.05.2017
13 :22
000051
11.3
11.3
0.0
002 : 00
29