Duct Work; Electric Wiring Work - Daikin FXMQ20PAVE Manual De Instalación

Ocultar thumbs Ver también para FXMQ20PAVE:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Drain pan
Air outlet
Drain pump position
Inspection window
Socket for maintenance
(with rubber cap)
Plastic water container
• On completion of the drainage check, refer to the following
illustration, attaching insulation for drain socket (14)
without gap, and insulation from the top of drain hose (2)
• clamp of metal clamp (1) using large sealing pad (6).
Large sealing pad (6)
(accessory)
Pile on (14) and roll
Insulation for drain
socket (14)
(accessory)
Start roll from near
tightening area of metal
clamp (1)
Metal clamp (1)
(accessory)
Drain hose (2)
(accessory)

8. DUCT WORK

Pay the utmost attention to the following items and conduct
the ductwork.
• Check that the duct will not be in excess of the setting range
of external static pressure for the unit. (Refer to the technical
datasheet for the setting range. Each model has each setting
range of external static pressure.)
• Attach a canvas duct each to the air outlet and air inlet so that
the vibration of the equipment will not be transmitted to the
duct or ceiling.
Use a sound-absorbing material (insulation material) for the
lining of the duct and apply vibration insulation rubber to the
hanging bolts.
• At the time of duct welding, perform the curing of the duct so
that the sputter will not come in contact with the drain pan for
the filter.
• If the metal duct pass through a metal lath, wire lath, or metal
plate of a wooden structure, separate the duct and wall
electrically.
• Be sure to heat insulate the duct for the prevention of dew
condensation. (Material: Glass wool or styrene foam;
Thickness: 25 mm)
• Be sure to attach the field supply air filter to the air inlet of the
unit or field supply inlet in the air passage on the air suction
side. (Be sure to select an air filter with a duct collection
efficiency of 50 weight percent.)
English
Drain socket
Service port
Control box lid
Control box
Terminal block for
power supply
Screw (3 positions)
Water inlet lid
Shall not have gap
Roll large sealing pad (6)
to make end side of clamp
fixture to be 2 layers
Large sealing pad (6)
(accessory)
• Explain the operation and washing methods of the locally
procured components (i.e., the air filter, air inlet grille, and air
outlet grille) to the customer.
• Locate the air outlet grille on the indoor side for the prevention
of drafts in a position where indirect contact with people.
• The air conditioner incorporates a function to adjust the fan to
rated speed automatically. (11. FIELD SETTING)
Therefore, do not use booster fans midway in the duct.
Connection method of ducts on air inlet and outlet sides.
• Connect the field supply duct in alignment with the inner side
of the flange.
• Connect the flange and unit with the flange connection screw
(3).
• Wrap aluminum tape around the flange and duct joint in order
to prevent air leakage.
Flange on air inlet side
(provided with the unit)
Screws for duct
flanges (3)
(accessory)
Air inlet
Insulation material
(field supply)
CAUTION
Connect the flange and unit with the flange connection screw (3)
regardless of whether the duct is connected to the air inlet side.

9. ELECTRIC WIRING WORK

9-1 GENERAL INSTRUCTIONS
• All field supplied parts and materials and electric works must
conform to local codes.
• Use copper wire only.
• For electric wiring work, refer to also "Wiring diagram"
attached to the control box lid.
• For remote controller wiring details, refer to the installation
manual attached to the remote controller.
• All wiring must be performed by an authorized electrician.
• This system consists of multiple indoor units. Mark each
indoor unit as unit A, unit B..., and be sure the terminal board
wiring to the outdoor unit and BS unit are properly matched.
If wiring and piping between the outdoor unit and an indoor
unit are mismatched, the system may cause a malfunction.
• A circuit breaker capable of shutting down power supply to
the entire system must be installed.
• Refer to the installation manual attached to the outdoor unit
for the size of power supply wiring connected to the outdoor
unit, the capacity of the circuit breaker and switch, and wiring
instructions.
• Be sure to ground the air conditioner.
• Do not connect the ground wire to gas and water pipes,
lightning rods, or telephone ground wires.
• Gas pipes : might cause explosions or fire if gas leaks.
• Water pipes : no grounding effect if hard vinyl piping is
used.
• Telephone ground wires or lightning rods : might cause
abnormally high electric potential in the ground during
lighting storms.
Flange on air outlet side
(provided with the unit)
Insulation material
(field supply)
Screws
Air outlet
Unit
for duct
flanges (3)
Canvas duct
(accessory)
(field supply)
9

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido