Appendix A: Installation protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item has been
performed or considered.
NOTE!
If a value is outside the limit or a result is incorrect or missing, this must be rectified
before the initial start-up and normal operation.
Unit No.
Description
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Total weight
Access for maintenance
Mounting (check availability)
Optional: Maintenance switch
Installation room and
ventilation openings
(indoor installation)
Foundation and outdoor
placement
(outdoor installation)
Dust collector
Duct system
Optional: Pilot signal cable
Start and control unit
Exhaust air duct directed
away from unit
Compressed air
Air lines cleaned
Air pressure
Clean and dry air (ISO 8573-1,
class 5)
Main compressed air valve
Compressed air connected
to unit
Initial start-up
Maintenance switch
Automatic start and stop, if
fitted
Vacuum limiting valve
Motor, direction of rotation
Time spent in Y mode
Start-up valve open when
motor switch to D-mode
All manuals and user guides at all-guides.com
Date:
Performed by:
Reference
'6.1 Delivery check'
'6.1 Delivery check'
'6.2.2 Foundation'
'Table 4-1: Technical data'
'6.2.1 Location'
'5.1 Connections'
'7.1 Indoor installation'
'6.2.2 Foundation',
'7.2 Outdoor installation'
See dust collector manual
'5.1 Connections'
'5.1 Connections'
See start and control unit manual
'7 Installation'
'7.3 Compressed air installation'
'7.3 Compressed air installation'
'7.3 Compressed air installation'
'7.3 Compressed air installation'
'7.3 Compressed air installation'
'8.2 Initial start-up'
'8.2 Initial start-up'
'8.2 Initial start-up'
'8.2 Initial start-up'
'8.2 Initial start-up'
'8.2 Initial start-up'
Result
Notes
RBU
EN
23