9. DISMANTLING
Remove all loads from the winch hook.
Wind the steel rope completely onto the drum.
Disassemble the fixing bracket (ref. B, fig. 8) and remove
the winch from the gantry guides. Carry out this operation
before emptying the ballasts.
10. TRANSPORT AND STORAGE
Do not leave the installed winch unattended without having
disconnected the electrical power line and wound the rope completely
onto the drum.
When storing the machine for a long period of time, protect it from
weather conditions.
During transport, protect the machine from blows and crushing to
avoid compromising its functionality and mechanical strength.
11. SCRAPPING
In the event of scrapping, proceed as follows:
a) drain off all oil by means of the relative plug.
b) Separate all plastic and electrical components (cables,
pendant control etc.)
c) Divide all metal components according to type (steel,
aluminium etc.)
On completion of the above, dispose of all components at authorised
waste disposal centres in compliance with current legislation.
Respect the environment; certain parts can be harmful to
persons or to the environment.
12. TROUBLESHOOTING
FAULT
The machine does
Emergency stop button
not lift or lower on
engaged
command
No power to machine
Plug not inserted
Power board cutout
tripped
Sliding not smooth
Frame wheels
on gantry rails
lubrication insufficient
IF THE FAULT PERSISTS
13. PROCEDURE IN CASE OF FAULT WITH LOAD SUSPENDED
- If possible remove the load from the nearest level, then dismount
the winch and service it.
- If this is not possible, use another lifting machine (with adequate
load capacity) from higher up and suspend the faulty winch both at
the load and at the winch attachment point.
Lift the faulty winch slowly off its fitting, then lower the entire load to
the ground.
- DO NOT adjust the motor brake with the load suspended as it would
be uncontrollable.
- DO NOT try to service the machine with the load suspended.
14. NOISE LEVEL AT THE OPERATOR'S EAR
The level Lp(A) given in the TECHNICAL DATA chart corresponds to
the weighted equivalent sound pressure level on scale A of European
Directive 98/37. This level is measured with no load, at the operator's
head in the working position 1.5 metres away from the instrument,
considering the different working conditions.
IMER INTERNATIONAL S.p.A.
CAUSE
SOLUTION
Turn to disengage
Check mains cable
Plug in
Reset the switch
Lubrificate wheels
Contact IMER Technical
Service