Descargar Imprimir esta página

PROTEOR 1P50-R Instrucciones De Uso página 8

Ocultar thumbs Ver también para 1P50-R:

Publicidad

Idiomas disponibles

Idiomas disponibles

Feet reference 1A101 :
- Spring grower G2
- Screw H1 (M10x30)
Dynastep Foot 1A101 when
fitted with the frame been
sawn to the length relevant
to feet 1A21 or 1A118 :
- Spring grower G2
- Screw H3 (M10x60)
- Wooden group 1D70/1D71
III : LENGTH ADJUSTMENT OF THE FRAME AND THE ROD (See figure 5)
CAUTION :
Check when fitting that the piston M (see figure 6) is in the neutral position. To make sure,
press the end of the rod C with your thumb (see figure 5) to move back the piston M, then
release the pressure to allow the piston M to return to the neutral position.
1 - Fit the prosthesis to measure the dimension X (See figure 5)
X = knee joint / heel
As indicated in figure 5, fit the following parts :
A
Complete frame with hydraulic unit
C
Rod (not connected with the eyelet of C
E
Lower joint
J
Foot
- Be care that the lower part of the frame be stopped by
the lower joint (see the contact point indicated by *
on figure 5).
. Fit the tool for locking in rotation Z.
Z2 threaded shank will get through the C rod head axis
hole.
Z1 tapped heads will be supported by frame A edges.
. Place under the heel a wedge L corresponding to the
height of the shoes instep usually worn by the patient.
. Keep the assembly vertical and measure the distance
X as indicated in figure 5.
15 maxi
10 mini
15 maxi
10 mini
A
*
E
J
1P5099-R-09/04
Page 8/21
Fig. 3
Fig. 4
Fig. 5
X
Z
C
L

Publicidad

loading