Options; Spool Holder En; Insulating Plate En; Memory Module En - Abicor Binzel MFS-V2 Instructivo De Servicio

Ocultar thumbs Ver también para MFS-V2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68

14 Options

14 Options
14.1 Spool holder
Fig. 16
14.2 Insulating plate
Fig. 17
14.3 Memory module
Installing the program
The program contained in the E-Box will be overwritten irrevocably when programming is carried out via the
memory module.
1 Switch off E-Box at the main switch.
2 Place memory module on interface X50.
3 Switch on E-Box at the main switch.
The program is installed.
The transmission takes approx. 1:30 minutes. After successful data transmission, the status LEDs will light up
green.
4 Switch off E-Box at the main switch.
5 Pull of memory module
6 Switch on E-Box at the main switch.
The program was installed successfully. E-Box and M-Drive are ready for operation.
14.4 Hand-held terminal
Use the hand-held terminal for the operating mode without BUS only
The hand-held terminal has been designed exclusively for the wire feeding system MFS-V2 and serves for
manual control of the system in the setup mode.
EN - 20
235,7
50
179
251,4
Spool holder
Insulating plate
342,6
60
512,6
295
225
MFS-V2
19,5

Publicidad

Tabla de contenido
loading

Tabla de contenido