Installing The Smoke Detector - Bosch FAD-420-HS-EN Guia De Instalacion

Ocultar thumbs Ver también para FAD-420-HS-EN:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 56
en | Product description
220
Installation
Figure 4.14: Installing the relay board
1.
2.
4.4

Installing the smoke detector

Figure 4.15: Mounting the detector
2015.03 | 6.0 | F.01U.033.733
w FAD-RB-DIBT Relay Board
Position the relay board exactly over the contact pins of the connection board.
If positioned correctly, the spacer bolts on the relay board align exactly over the holes in
the connection board.
Press down the relay board evenly at the four corners until the spacer bolts click into the
holes on the connection board.
y Detector base
x FAD-420-HS-EN Connection Board
z Smoke detector
Installation Guide
Duct Smoke Detector
Bosch Sicherheitssysteme GmbH

Publicidad

Tabla de contenido
loading

Tabla de contenido