5.6.
Fitting the connections
5.6.1.
General information
DANGER
Risk of property damage!
Do not use the sedimentation tank until the inlet and outlet connections have been fully
connected and checked for leaks.
NOTE
To avoid leaks and damage at the operating location, installation by a specialist is
recommended.
INFORMATION
If the optionally available cover (Item 8) is used, it must be placed on the sedimentation tank
before the inlet connection is fitted.
5.6.2.
Preparing the operating location
Step
Description
1
Remove the existing trap under the sink (B).
Store the removed parts (B) carefully until further
2
use.
The existing plughole (strainer) in the sink drain
3
remains fitted (A).
The inlet connection from the sink to the
4
sedimentation tank is now open (A).
The drain connection to the sewage system is
5
also open (C).
The thread on the sink (A) should be 1 ½" or
6
1 ¼".
The drain pipe to the sewer (C) should have a
7
diameter of 40-50 mm.
Additional adapters, pipes, hoses or fitting
8
material are available at any DIY or plumbing
store.
25 / 112 - EN -
Illustration