Ingeteam NEO Manual De Instalación página 18

Ocultar thumbs Ver también para NEO:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Ingeteam
3.
Strip the power cables 10 mm and the neutral cable 8 mm.
4.
Put the contacts of the power and neutral cables in the CURVEx3 and tighten the screws.
CAUTION
The incorrect or incomplete connection of voltage or other terminals can cause the device to malfunction or be
damaged.
5.
Prepare the wiring between the three-phase energy meter and the Smart Gateway (stripping the cables
6 mm at the ends that go to the latter), put the contacts of the power and neutral cables in the Smart
Gateway and tighten the screws.
Phase 1
Phase 2
Phase 3
Neutral
18
L1, L2, L3: Phase lines.
N: Neutral
Phase 1
Phase 2
Phase 3
ABV2013IQM01_ - Installation manual
Installation

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Neo pro

Tabla de contenido