Installation; Installation Of The Neo Or Neo Pro Charger; Check The Power Supply Cut; Check The Connections - Ingeteam NEO Manual De Instalación

Ocultar thumbs Ver también para NEO:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

3. Installation

3.1. Installation of the NEO or NEO Pro charger

3.1.1. Check the power supply cut

Make sure the power supply is interrupted at the point of installation of the charger.

3.1.2. Check the connections

Check that the required electrical wiring for powering the charger is available at the point of installation.
OPTIONAL: If a CURVE device will also be installed, check that the wiring from that device is also available. For
more information, see
"Installation of the CURVE
OPTIONAL: If the charger will be connected to a three-phase energy meter, communications equipment (modem,
router, switch, etc.) or another charger, check that the Ethernet wiring from that device is also available. For
more information, see
"Installation of the CURVEx3"
communications
element".

3.1.3. Optional: install the stand element

If it is necessary to install the STAND element to anchor the charger to the ground, see
element
(optional)".

3.1.4. Optional: Install the SIM card.

If it is necessary to install the SIM card, see

3.1.5. Place the template

Place the template in the desired position, approximately 1.2 m from the horizontal reference to the ground.
CAUTION
It is recommended to use a level to ensure that the template is perfectly level.
1.2 m
ABV2013IQM01_ - Installation manual
device".
and/or
"Connection of the charger to another charger or a
"3.2. SIM card
installation".
Ground
Ingeteam
"Installation of the STAND
Connector height
EN
ES
FR
IT
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Neo pro

Tabla de contenido