1.0 GENERAL RULES
Ensure that the installation of your product conforms to all the indications given below.
Fig. 1
CHIMNEY STACK
CHIMNEY
CONNECTION
FLUEWAY
SOOT INSPECTION APERTURE
FRESH AIR INTAKE
ELECTRIC
POWER SUPPLY
CAPACITY LOAD OF
MINIMUM SAFETY
SOOT INSPECTION
We recommend that the flue must have a chamber for collecting solid matter and any condensate located below the connection
and which may be easily inspected by means of an airtight door. (Fig. 1)
TO FLUE
THE FLOOR
DISTANCES
4