Assembly Procedure; Check On Unpacking - Zodiac Futura Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

The boat assembly procedure follows an order you must respect. Proceed step by step, referring each
time to the pages indicated for explanations.
1. Make an inventory of the parts of the boat and get to
know them.
2. Activate the valves in inflating position
3. Slightly inflate the main buoyancy tube
4. Assemble the floorboard (according to chosen option)
5. Finish inflation of the boat to the correct pressure
6. Install equipment (according to chosen option)
CAUTION
The pack must contain: 1 buoyancy tube +
ZODIAC FUTURA
Owner's manual (2 volumes)
Repair kit
Standard equipment
Paddles
Pressure gauge
Foot-pump
Bow bag
Carrying bag
You can equip your boat with many optional accessories (transportation wheels, ladder, bag under the
bench, lifting rings etc.). Ask your dealer to advise you.
NOTE:

ASSEMBLY PROCEDURE

PROCEDURE

CHECK ON UNPACKING

IF YOU WISH TO ADD LIFTING RINGS (FOR PLACING ON THE DAVIT),
YOU MUST FIX THEM ON THE BUOYANCY TUBE, NEVER ON THE
FLOOR.
PAGE
2
I - IV
6
7
3-5
7-8
9
V
DO NOT USE A SHARP TOOL
(CUTTER, KNIFE, ETC.)
MARK 2C
X
X
2
1
1
1
2
/ 10
2
SECTION
CHECK ON UNPACKING
DESCRIPTION
INFLATION SYSTEM
INFLATING THE BOAT
ASSEMBLY
INFLATING THE BOAT
PRESSION
ASSEMBLY OF EQUIPMENT
MARK 2
MARK 3
X
X
2
1
1
1
2
X
X
2
1
1
1
2

Publicidad

Tabla de contenido
loading

Tabla de contenido