Greenlee 881GX Cam Track Manual De Instrucciones página 13

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

20. Place a Greenlee 900 series hydraulic pump next to
the bender on the floor so the front of the pump is
facing the operator.
21. Attach the free end of the hose from the ram to the
pump coupler, make sure the coupler is screwed
tight to ensure proper ram function. Incomplete con-
nections may not allow the ram to retract after the
bend is complete.
22. Assume a proper operating position where you are
not in the path of the conduit or ram and can clearly
see the bender scale and pump. (Fig,14)
23. Snug-up the conduit by advancing the ram accord-
ing to the pump instructions. The conduit is
snugged-up when the shoe, conduit, and follow bar
are tight. Stop the pump before the conduit starts to
bend.
24. Move the scale's O-ring to Z-Position. See
Calculate Ram Travel section for equation and
tables.
25. Monitor the bending process. Advance the ram to
Z-position. The bend is complete when the O-ring
reaches the top of the cylinder block. Stay out of
the line of the conduit and ram while bender is in
motion.
26. When bend is complete, operate the pump, accord-
ing to its instructions to retract the ram to the start-
ing position for the next bend.
27. Remove the saddle pin, saddle and conduit from
bender. Compress the toggles and pull the Yoke and
Saddle pins out to disconnect accessories. (Fig. 15)
28. Inspect the finished bend.
52093598 Rev 00
Cam Track® Hydraulic Bender
Figure 14
© 2022 Greenlee Tools, Inc.
Figure 15
13

Publicidad

Tabla de contenido
loading

Tabla de contenido