Before Initial Operation; Charge Battery; Maintenance - Cleco CellCore CCBA Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
1
EN
6

Before Initial Operation

EN

Charge Battery

Battery pack is supplied partly charged and must be
charged completely being used for the first time.
See Original Instructions of Milwaukee charger.
Do not use any other battery packs / chargers than
the following:
Battery pack 18 V
Order no.
Capacity
T50-1000497
2,0 Ah
T50-1000498
5,0 Ah
Charger 18 V
Order no.
Country
T50-1000499
North America
T50-1000506
Europe
T50-1000507
Brazil
7

Maintenance

Implement a comprehensive safety maintenance program to provide regular inspection for all phases of tool operation
and power supply.
Note
Loss of warranty
Repairs are only permitted by Apex Tool Group authorized personnel. If the tool is opened, the warranty
is voided.
If repair is required send the complete tool to Sales & Service Center!
Maintenance after every ... cy-
cles
1
Daily
500,000
or at least once a year
1
Use of 80 % of maximum torque
10
Order no.
T50-1000543
T50-1000544
T50-1000545
T50-1000546
T50-1000500
T50-1000508
T50-1000547
Working with controller (mPro-Modus)
Stand-alone (FastApp-Modus)
1-Bay
Measures
Check all connections.
Visual inspection for general damage.
Perform a general function test and watch out for excessive vibration or unu-
sual noise.
Send the tool to a certified Sales & Service Center for assessment.
P2390BA | 2022-10
Country
Argentina
United Kingdom
China
Japan
North America
Europe
United Kingdom
Configure the tool, refer to the Programming Manual
tool.
Configure WLAN on the controller, refer to the Quick
Installation Guide and the Programming Manual
mPro(...)GCD.
Configure the tool, refer to the Programming Manual
Cordless EC Tool.
6-Bay
Apex Tool Group

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cellcore ccbp

Tabla de contenido