Descargar Imprimir esta página

Lenze L-force 9400 E94AYAE-SM301 Instrucciones Para El Montaje página 30

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3
Electrical installation
All manuals and user guides at all-guides.com
Terminal assignment
Note!
Provide for a sufficient strain relief, so that the terminals are not pulled from
the plug connectors, in particular when you use rigid cables.
X82.1
Labelling
GO
O1B
O1A
X82.2
Labelling
-
+
GIR
RI1
GO
24O
AIE
CLA
CLB
30
Description
This part of the terminal strip is not assigned.
GND SD-Out1
Safe monitor SD-Out1, channel B
Safe monitor SD-Out1, channel A
This part of the terminal strip is not assigned.
Description
GND external supply
+24 V external supply via a safely separated power supply unit
(SELV/PELV)
This part of the terminal strip is reserved.
GND 24O
+24 V external supply for the safe monitor SD-Out1 (SELV/PELV)
Error acknowledgement input ("Acknowledge In Error")
Clock output for passive sensors, channel A (Clock A)
Clock output for passive sensors, channel B (Clock B)
EDK94AYAE DE/EN/FR/ES/IT 1.1

Publicidad

loading