Preload setting – rotary drive
6.4
In case of a rotary application, respect the following procedure.
6.4.1
Installation on the machine
Ring gear mounting tolerances: check the run-out of the ring gear with a pin every 20 teeth. Compare the
values with the norm ISO1328-2. For crown gear quality, please consult us.
6.4.2
DRP+ parallelism tolerances, height setting, tooth meshing validation
Follow the procedure in chapter 4.
6.4.3
Preload setting
See chapter 6.3.
This document must not be reproduced nor information therein disclosed without our authorization
DRP+ User manual
Ref.: RX182/009
Version 01/2017 - English
Page 29 / 30