ZGR SOLAR STR 250
The tools recommended are (Table 4-1):
ITEM
Phillips screwdriver/ electric screw driver
Marker
Level
Hammer drill
Socket wrench
Wrench
The spare parts (Table 4-2):
Follow these steps to mount the inverter:
1) Assemble the mounting-bracket by using the connecting bar (Fig. 4-10).
2) Level the assembled mounting-bracket by using the level, and mark the positions for drilling holes on the
PV bracket. Drill the holes by using a hammer drill (Fig. 4-11).
Operation manual
Fig. 4-9 Dimensions of mounting-bracket
Table 4-1 Recommended tools
ITEM
QUANTITY
Grub screw
2
Marker
2
Level
4
Table 4-2 Recommended spare parts
Fig. 4-10 Connecting bar
SPECIFICATION
M4, M6
-
-
φ
Drill bit:
Including 16mm socket
Opening: 16 mm
SPECIFICATION
SOURCE
M4 x 10
Delivery scope
M6 * 35
Delivery scope
M10
Delivery scope
www.zigor.com
12
16