SET UP & USE
4. Align L-BP (LEFT DRYER SUPPORT) and insert into LF1-1 (UPPER LEFT FRONT
VERTICAL POLE) and LB2-1 (UPPER LEFT BACK VERTICAL POLE). Use 25S
screws to secure poles onto support. Make sure 25S screws are inserted with the
butterfly wing on the exterior side of the unit.
25S
25S
L-BP
LB2-1
LF1-1
Follow the same steps to assemble the right side:
Align R-BP (RIGHT DRYER SUPPORT) and insert into RF1-1 (UPPER RIGHT FRONT
VERTICAL POLE) and RB2-1 (UPPER RIGHT BACK VERTICAL POLE). Use 25S
screws to secure poles onto support. Make sure 25S screws are inserted with the
butterfly wing on the exterior side of the unit.
L-BP
LF1-1
Connecting Rail
Support Rail
LF1-2
L-BP
LEFT SIDE
25S
25S
L-BP
LB2-1
LF1-1
LB2-1
RF1-1
LB2-2
RF1-2
Reinforcing Bar
R-BP
25S
RB2-1
Connecting Rail
Support Rail
RB2-2
Reinforcing Bar
R-BP
RIGHT SIDE
Page 11