Operation
Cable Installation and Routing and Final
Handle Installation
Open the flap (29) (as shown in Step A) in the lower
part of the shaft guide (16b). This flap can be
unlocked with the latch on 16b from inner side of the
filter housing.
Guide the power cord through the upper part of the
shaft guide (16a) as indicated by the dash-dot line
B
16a
(Step B).
18
Loosely route the power cord cable to the mains
connector (27) at the bottom of the filter housing
D
(Step C).
16b
29
Then the upper guide (16a) and lower guide (16b)
A
parts, assembled as shown can be locked together
17
(Step D).
25
The handle assembly then has to be inserted into the
lower part of the bearing guide (17) (already
assembled with the filter bag housing) and will be
7
secured with the two remaining M5x30 screws (7).
C
27
29
Plug-in power cable plug (9) into mains connector
(27). Route cable as shown from bottom to top using
fixing points (28). All remaining cable length will then
move to the top automatically.
Close flap (29) of cable inlet.
28
When not in use, cable can be rolled up between the
rotating cable hook (18) and the grip.
28
Filter compartment, front view.
Cover not shown.
27
86452440 Manual Ranger 12 120V 60Hz
9