Descargar Imprimir esta página

ABB ACH580-04 Guía Rápida De Instalación Y Puesta En Marcha página 9

Ocultar thumbs Ver también para ACH580-04:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
To unpack:
• Cut the bands (A).
• Unpack the additional boxes (B).
• Remove the outer sheathing by lifting it (C).
• Remove the sheathing by lifting it (D).
• Remove the pedestal guide plate as shown below.
Note: The pedestal guide plate is not included with options +0H354 and +0P919.
5
1
15
10
17
16
8
3
6
2
13
EN – Quick installation and start-up instructions 9
9
12
14
11
18
4
7
3AXD50000013807
Box B1 contents (option +B051)
1
Paper fill
2
Clear plastic shroud for output
power cabling
3
Mounting bracket for bottom grille
4
Cardboard box bottom
5
Cardboard box cover
6
Bottom grille
7
Support
8
Straps
9
Screws in a plastic bag
10
Back clear plastic shroud (lower)
11
Back clear plastic shroud (upper)
12
Front clear plastic shroud
13
Clear plastic shroud for input power
cabling
14
Top clear plastic shroud
15
Entry clear plastic shroud for side
input cabling
16
Clear plastic bottom shroud 1
17
Clear plastic bottom shroud 2
18
Metallic shroud
EN
DE
ES
FR
IT
TR

Publicidad

loading