Descargar Imprimir esta página

Volvo Penta MCC Instrucciones De Montaje página 6

Ocultar thumbs Ver también para MCC:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
Read through the instructions before you begin to work.
Check that all parts are included in the package.
Items in illustrations in the instructions may diff er from
the model being worked on. The illustrations are used
for diff erent instructions and may therefore vary between
engine models. The essential information is correct.
This kit contains:
Designation
Quantity
MCC box
1
Terminal block tool
1
Plastic key
1
Spare fuse
4
Installation instruction
1
Other components, not included in the kit:
Screw, M8
4
Cable glands
X
Installation, general
• Meet the classifi cation rules stated by the related
classifi cation society.
• Use ABYC Standard cables, Category A.
• Make sure that there is suffi cient cable to allow the unit
to be removed for service.
• Do not run cables with sharp bends.
Location
Install the box in the vicinity of the engine in engine room.
Fig. 1-2
Installing the MCC box
• Drill holes for cable fi ttings. Use pilot holes.
Refer to Fig. 2.
• Use Type approved IP65 standard cables.
• Use strain relieving cable glands, IP65. Refer to Fig. 2.
Alternative 1: Mount the box using four M8 screws.
Apply sealant. Refer to Fig. 1.
Alternative 2: Weld the MCC box to a rig.
Fig. 6
Code
VODIA Parameters
P107S
Battery voltage 2
If no secondary power supply is availible on ech drive line, set the value to
false.
P107T
Bridge emergency stop enable
Enable bridge emergeny stop input. To disable emergency stop on the
bridge, set value to false.
P107V
Engine room emergency stop enable
Enable engine room emergency stop input. To add emergency stops for the
engine room, set value to true. If set to false, the emergency stop will not
work.
Engine coolant temperature
P107U
Engine coolant temperature, default value.
P107W
Tranmission oil pressure
Transmission oil pressure, default value.
IMPORTANT: Before any work with the electric weld
can begin, the connection to all control units must be
disconnected. After fi nished welding, reconnect the
connection to all control units before connecting any
power cable.
IMPORTANT: Observe meticulous cleanliness when
handling system components. Even minimal amounts of
dirt and/or metal fi lings could cause a breakdown.
Fig.
Position
1
1
Fig. 3
-
-
Connecting cables
3
2
For more detailed information, refer to CAMS drawings,
-
-
available on VPPN, Service, Marine Commercial Control.
-
-
Fig. 4
1
3
IMO2 / IMO 3 switch
2
4
EATS limited.
Fig. 5
Combined Genset
NOTE! Shut down override must be connected. Use Type
approved IP65 standard cables.
1. Mount the wiring harness between the SDM (Shutdown
2. Use resistors, position 5, in both ends (included in the
3. Connect X20:8 to X1:2
4. Connect X20:6 to X1:3
5. Use strain relieving cable glands, IP65, position 6.
Fig. 6
Vodia Parameters
Fig. 7
External Yard connection
Calibration and settings
Regarding specifi cations for AUX, PROP, Harbour Genset
and Emergency Genset, refer to CAMS drawings and
ComAp Global guide, available on VPPN, Service, Marine
Commercial Control.
Module) box and the MCC Electrical box.
SDM kit)
Value
True or False
True or False
True or False
True or False
True or False

Publicidad

loading