Packaging And Storage; Commissioning, Operation; Mounting Preparation - WIKA GLS-1000 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Transport ... / 5. Commissioning, operation

4.2 Packaging and storage

Do not remove packaging until just before commissioning.
Permissible conditions at the place of storage:
Storage temperature: -30 ... +80 °C (-22 ... +176 °F)

5. Commissioning, operation

Observe all instructions given on the shipment packaging for
removing the transportation safety devices.
Remove the float switch carefully from the packaging!
When unpacking, check all components for any external damage.

5.1 Mounting preparation

Functional check
Before mounting, the float switch can be connected as
described in chapter 5.3 and the switch points can be
operated manually.
CAUTION!
Damage to property
When performing the functional check on the active plant,
processes can be started unintentionally.
The switches must not be tested on the active control of
the plant.
Ensure that the sealing faces of the vessel or float switch are clean and
do not show any mechanical damage.
WIKA operating instructions model GLS-1000
EN
11

Publicidad

Tabla de contenido
loading

Tabla de contenido