Descargar Imprimir esta página

MBM PLG94TG Manual De Uso E Instalación página 35

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
The distance between the appliance
and the filter of the extraction hood
must be at least 20 cm.
Once the appliance is con-
nected to the power and drain
sources, it must remain static
(fixed) in the place of use and main-
tenance.
A safety valve must be installed
on the network upstream of the
main supply line. It must be ea-
sily identifiable and accessible by the
operator (Fig. 3)
To make the connection to the
mains, it is necessary to have
a hose conforming to the local
law in force and with the characteri-
stics specified in EN ISO 228-1 or
EN 10226-1 / -2.
The gas supply pipe must com-
ply with local regulations in force
and must be periodically re-
viewed and/or replaced in accordan-
ce with local conformities in force, by
authorized personnel.
The outlet from the appliance is
"male" type and 1/2"G. The con-
nection pipe must be of "fema-
le" type and 1/2 "G as described by
local standards.
The pipes must be screwed fir-
mly to their attachment points.
Conduct a test to ensure that there
are no gas leaks once the network
gate valve is open (Fig. 4).
Upon completion of the operations descri-
be, close the network gate valve (Fig. 3).
THE PRESENT MANUAL IS PROPERTY OF THE MANUFACTURER. ANY REPRODUCTION, EVEN PARTIAL, IS PROHIBITED.
POWER SUPPLY CONNECTIONS
If it is necessary to replace the
nozzle to conform to another
type of gas supply, see the pro-
cedure described in the Operations
for commissioning (see chapter 5).
GAS TYPE CHANGE - see SECT.
IMAGES - REF. f)
The appliance comes from the
factory with setting to the type
of power indicated on the plate.
Any other configuration that changes
the parameters set must be authori-
zed by the manufacturer or by its re-
presentative.
The transformation from one
type of power to another must
be performed by qualified te-
chnical personnel authorized to per-
form the operation in question. The
correct procedure to be implemen-
ted for the transformation is descri-
bed in the relevant manual.
Injectors - By Pass - Pilot injec-
tors - Apertures - and anything
necessary for any gas transfor-
mation must be requested directly
from the manufacturer.
At the end of the transforma-
tion from one type of power to
another, change the label on the ap-
pliance with new the parameters re-
ported on the adhesive document
provided.
Two plates may need to be re-
placed in certain cases (oven
equipment), one outside near
the gas attachment and one inside
(see image reference f).
- 11 -
4.
EN

Publicidad

loading

Este manual también es adecuado para:

Plg78tgPlg74agPlg78agPlg74tgPlg98tgPlg94ag ... Mostrar todo