Descargar Imprimir esta página

BSV BS POOL PRO200 Manual De Usuario página 41

Ocultar thumbs Ver también para BS POOL PRO200:

Publicidad

Idiomas disponibles

Idiomas disponibles

3- INSTALLATION OF THE EQUIPMENT
3.1- General considerations:
• Place the chlorination cell in the highest position possible of the purification
circuit and always after the filter.
• If possible, it is recommended to install the cell with a by-pass system with
its corresponding shut-off valves. This is to facilitate maintenance of the cell.
• A good earth connection is essential. Use a differential relay with max.
30mA of sensitivity.
• If a good quality earth connection is not available, place an earth
connection kit between the electrolysis cell and the redox probe.
OPTIONAL KIT
Manual PRO200-IP65 v1.0
41 / 66

Publicidad

loading