Descargar Imprimir esta página

Homelite UT9C5000D Manual Del Operador página 21

Publicidad

Idiomas disponibles

Idiomas disponibles

STORAGE
When preparing the generator for storage, allow the unit to cool completely then follow the guidelines below.
STORAGE TIME
Less than 2 months
 Drain gasoline from tank and dispose of in a suitable container according to state and local ordinances.
2 months to 1 year
 Drain fuel from carburetor.
 Drain gasoline from tank and dispose of in a suitable container according to state and local ordinances.
1 year or more
 Drain fuel from the carburetor.
 Remove spark plug.
 Drain gasoline from tank and dispose of in a suitable container according to state and local ordinances.
 Put a tablespoon of engine oil into the spark plug cylinder. Turn the engine slowly with the pull rope
 Reinstall spark plug.
 Change engine lubricant.
After removal from storage:
 Fill with fresh gasoline.
NOTE: If storing gasoline in suitable container for later use, make sure gasoline has been treated with fuel stabilizer
according to stabilizer manufacturer's instructions.
MAINTENANCE SCHEDULE
Check Engine Lubricant
Change Engine Lubricant
Check Air Filter
Clean Air Filter
Change Air Filter
Check/Adjust Spark Plug
Replace Spark Plug
Check/Adjust Idle Speed
Check/Adjust Valve
Clearance*
Clean Fuel Tank and
Filter*
Check Fuel Hose
Check All Hose
Connections
Inspect Fuel Tank Vapor
Vent (If Equipped)
Inspect Carbon Canister
(CARB Models Only)
* These items should only be carried out by an authorized service center.
NOTE: Maintenance should be performed more frequently when generator is used in dusty areas.
When generator has exceeded the maximum figures specified in the table, maintenance should still be cycled
according to the intervals of time or hours stated herein.
MAINTENANCE
to distribute the oil.
After 1st month
Before
or 20 hours of
each use
operation
PRIOR TO STORING
Every 3 months
or 50 hours of
operation
Page 17 — English
Every 6 months
Every year or
or 100 hours
after 300 hours
of operation
of operation

Publicidad

loading