Descargar Imprimir esta página

Tripp-Lite SmartRack AG-039A Manual Del Propietário página 10

Ocultar thumbs Ver también para SmartRack AG-039A:

Publicidad

Idiomas disponibles

Idiomas disponibles

Enclosure Configuration
Adding or Removing Side Panels
3
Lift the panel away from the brace that supports it.
To Reinstall Side Panel, Reverse Steps 1-3
Adjusting Mounting Rails and Cable Management Rails
WARNING: Do not attempt to adjust rails without assistance. Do not attempt to adjust rails while equipment is installed in the enclosure. Do
not attempt to use rails without screws installed (6 per rail).
The 4 mounting rails are pre-installed to accommodate equipment with a mounting depth of 30 inches (762 mm). Do not adjust the mounting rails unless
your equipment requires a different mounting depth. The front and rear sets of rails can be adjusted independently in ¼-inch (6 mm) increments for
mounting depths between 4 inches (101.6 mm) and 42 inches (1066.8 mm).
1
Each rail is connected to the enclosure with 6 screws - 1 pair at the upper beam
middle beam
B
and 1 pair at the lower beam
2
Remove the screws fastening each of the rear mounting rails to the enclosure. (If adjustment of
the front rails is required, you can also remove the screws from the front rails.)
3
Slide the mounting rails to the desired depth and reattach them using the screws you removed in
Step 2. The rail attachment points are numbered
same depth.
The depth of the 2 cable management rails can be adjusted using the same method.
(continued)
C
.
A
to help you align each pair of rails at the
10
3
A
, 1 pair at the
1
2
3
A
B
C
8
A
5

Publicidad

loading