Descargar Imprimir esta página

Daitsu APD 9AM Manual De Instrucciones página 50

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Window Kit Installation
Your window kit has been designed to fit most standard Vertical and horizontal win-
dow applications, However, it may be necessary for you to improvise/modify some
aspects of the installation procedures for certain types of window. Please refer to
Fig.for minimum and maximum window openings.
Drain Tank Safety Feature
This unit is equipped with a internal water tank, two full-safe switch mechanisms,
one is used to control the water pump drainage, the other is used to monitor the
water level inside the internal water tank. When the water level reaches a predeter-
mined level, the full-safe switch mechanism is activated. The digital display shows
P1 and the water full indicator light illuminates. Carefully move the unit outside,
remove the rubber blockage from the back drainage hole and drain the water off.
The unit will continue operating properly.
48
INSTALLATION
Window
Window Slider Kit
Minimum:67.5cm(2.22ft).
Maxmum:123cm(4.04ft).
Window
Window Slider Kit
Minimum:67.5cm(2.22ft).
Maxmum:123cm(4.04ft).

Publicidad

loading

Este manual también es adecuado para:

Apd 12amApd 12t