10.3 CASCADE FLUES
This type of duct evacuates the products of combustion of more than one boiler in a cascade connection through a shared fumes
collector. The manifold has an incorporated clapet valve and must be used only to connect the boilers to the flue duct. The
diameters available are: Ø160 mm and double diameter Ø160/250 mm. A range of accessories is available on request.
TABLE 1B
MAXIMUM NUMBER OF BOILERS
IN CASCADE CONNECTION
BOILER
MODEL
Ø 160 mm
1.115 - 1.130
2
1.150
2
In this outlet typology, a fumes clapet valve (no-return valve), Ø 110/110 mm, must be fitted to each boiler. Change the
parameter P60 as shown in table 1B following the procedure described in chapter 14.
The flue header size must be calculated by a qualified technician during the system design stage, as required by current
regulations.
11. ELECTRICAL CONNECTIONS
This machine is only electrically safe if it is correctly connected to an efficient earth system in compliance with current safety
regulations. Connect the boiler to a 230V single-phase earthed power supply using the supplied three-pin cable, observing correct
Live-Neutral polarity.
Use a double-pole switch with a contact separation of at least 3 mm.
When replacing the power supply cable, fit a harmonised "HAR H05 VV-F" 3x0,75 mm
To access the terminal block, remove the front boiler panel (fixed with two screws at the bottom), turn the control box downwards
and access terminal blocks M1, M2, M3, used for the electrical connections, after removing the protective cover. The 3.15 A fast-
blowing fuses are incorporated in the power supply terminal block (to check and/or replace the fuse, pull out the black fuse carrier).
SEE WIRING DIAGRAM IN ANNEX "SECTION" B AT THE END OF THIS MANUAL
Make sure that the overall rated power input of the accessories connected to the appliance is less than 2A. If it is higher, install
a relay between the accessories and the electronic board.
The connections in terminal blocks M1- M3 are high voltage (230 V). Before making connections, make sure the appliance is
disconnected from the power supply. Respect the input polarity on terminal block M1: L (LINE) - N (NEUTRAL).
TERMINAL BLOCK M1
(L) = Live (brown)
(N) = Neutral (light blue).
= Earth (yellow-green).
(1) (2) = contact for Room Thermostat.
Put back the jumper on terminals 1-2 of boiler terminal block
M1 if the room thermostat is not used or if the Remote Control,
supplied as an accessory, is not installed.
TERMINAL BLOCK M2
Terminals 1 (back-lighting) - 2 (earth) - 3 (+12V): connection to the
Remote Control (low voltage) supplied as an accessory.
Terminals 4 - 5 (common): External Probe connection (supplied as
an accessory)
Terminals 6 - 5 (common): 2nd Auxiliary Probe (probes for solar
plant, cascade system, etc.).
Terminals 7 - 5 (common): 1st Auxiliary Probe (probes for solar
plant, cascade system, etc.).
Terminals 9-10: storage boiler sensor connection.
Terminal 8: not used.
PARAMETER P60
Revs/min (rpm) at
minimum Power
Ø 160/250 mm
G20
4
1850
4
1850
33
G31
2000
2000
cable with a maximum diameter of 8 mm.
2
1
1
2
2
M2
M2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
M1
M1
2
2
1
1
N
N
L
L
M3
M3
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
CG_2230
CG_2230
10
10
11
11
12
12
7690785.01 (2-07/18)

Publicidad

loading

Este manual también es adecuado para:

Luna duo-tec mp+ 1.130Luna duo-tec mp+ 1.150