Descargar Imprimir esta página

Celexon Motor Professional Plus Manual De Instrucciones página 20

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
STEP 2: PREPARE THE SCREEN
Loosen the screws of the mounting
plate above the screen housing. Slide
the mounting plates to the ends of the
housing and tighten the screws.
Please make sure that the holes for the
threaded rods are not blocked by the
housing.
STEP 3: PREDRILLING
Drill four holes in your load-bearing (concrete) ceiling and insert the metal do-
wels (E).The distance between the holes should be L+ 40mm x 94mm.
If necessary, use other dowels and screws to suit your structural conditions.
Now attach the four mounting brackets (A) to your ceiling. Make sure that the
brackets are held firmly and securely to ensure a safe and long-lasting instal-
lation of the screen.
Then attach the threaded rods (D) to the mounting brackets and screw one
hexagon nut over each to the height of the suspended ceiling. If necessary, the
threaded rods must be shortened by the user to suit the dimensions required.
7

Publicidad

loading