Descargar Imprimir esta página

V2 AYROS-230V Instrucciones De Montaje página 34

Publicidad

Idiomas disponibles

Idiomas disponibles

3 - INSTALLATION OF THE MOTOR
PREPARATORY STEPS
CAREFULLY OBSERVE EUROPEAN REGULATIONS EN12445 AND EN12453 (WHICH REPLACE UNI 8612).
Always check the following:
• Your gate should have a strong and suitable build; no wickets should be present on the sliding gate.
• The sliding gate should not tilt excessively during its entire run.
• The gate should be able to slide freely on its guiding surface without an excessive friction.
• Install both closing and opening limit switches, in order to prevent the gate going off the guiding surface.
• Remove any manual locks.
• Bring power cable ducts near the bottom of the gate (diameter 20 / 30 mm) and of the external devices
(photocells, flasher, key selector).
3.1 - POSITIONING OF THE MOTOR
To fix AYROS, follow the instructions below:
1. use the measurements indicated in the drawing for the foundations
2. Arrange for one or two pipes for the passage of electric cables
3. Assemble the 4 clamps on the anchoring plate and fix them with the 4 bolts issued with the motor
4. Pour the concrete and position the anchoring plate
WARNING: check that the plate be on a perfectly levelled surface and parallel to the gate
5. Wait for the complete setting of the concrete
6. Unscrew the bolts fixing the base to the clamps and put the motor on the plate
7. Adjust the 4 grains to make the motor be perfectly levelled
8. Control that the motor is perfectly parallel to the gate, then insert the 4 washers R and lightly screw the 4 bolts D
WARNING: Drill holes in the gasket G to run the cables to be connected to the control unit.
32

Publicidad

loading