Descargar Imprimir esta página

Porsche E-Performance Standhalterung Manual De Instalación página 18

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
Installation
Installation on a substrate/
foundation to be produced on site
A
A
32
14
(50)
(50)
(50)
315
630
730
278
158
Fig. 4: Foundation dimensions
▶ For drilling dimensions for the anchor rods,
see Fig. 2.
18
Foundation reinforcement
diagram
The diagram below shows installation with clearance.
Installation may also be flush with the ground,
however.
Information
Structural engineering expertise is required to
produce the foundation in accordance with the
foundation reinforcement diagram.
Bracket
1
150
(50)
500
1:20
600
630
2
150
1:20
500
3
150
1:20
480
Fig. 5: Foundation reinforcement diagram
Removing the charging dock panel
2
1
2:25
1. Undo the M8 screws
(3x) to remove the
mounting panel for
the charging dock.
2. Using a glass suction
lifter, detach the
charging dock panel
from its fitting. Care-
fully tilt the panel and
lift it up and out of the
base frame.

Publicidad

loading

Este manual también es adecuado para:

971 044 030