☞
Important!
Before installing, flush the pipes in compliance with DIN 1988.
☞
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
☞
Depending on the composition of the wall, special wall dowels may have to be used
(to be provided by the customer).
Fig. A: Water connection from above
Fig. B: Water connection from rear
12.1 Only when the water connection is from the rear: Install the connection bracket (a)
leak-tight.
12.2 Screw-in the water volume regulators(b) leak-tight.
12.3 Align the water volume regulator in such a way that the screw plug and the operating
element are freely accessible.
12.4 To ensure that the shower head can be adjusted within the height range of 2.10 m to
2.30 m, mark the installation holes at a height (c) of 2.12 m to 2.32 m from the upper
plane of the finished floor.
12.5 Drill according to the markings.
12.6 Insert the dowels.
12.7 Screw on the hook-in strip.
12.8 Hang in the shower panel.
12.9 Mark the other hole.
12.10 Remove the shower panel.
12.11 Drill according to the markings.
12.12 Insert the dowel.
☞
The battery compartment and/or the power supply and extension cables are not
included (see Accessories,
☞
If a in-wall power supply is used, it must be installed about 3 m away from the
shower.
12.13 Connect the AQUACONTACT sensor (f) with
– a battery compartment (d)
or
– an in-wall mounted power supply (e).
☞
When the battery charge level is too low, the LED flashes with a 20 s cycle.
12.14 Only when the water connection is from the rear: Bring forward work steps 12.16 to
12.18.
12.15 Hook the shower panel into the hook-bar strip and fasten with screws.
12.16 Connect the water supply.
12.17 Use a hollow hexagon wrench to open the water volume regulators.
g: closed
h: open
12.18 Check the water connections for leaks.
Chapter
25).
- 7 -