4.5.3 Cleaning of the parts in contact with food substances
With distributor switched on effect a cleaning of the mixers pressing the
buttons according to what is described in the service functions so as to eli-
minate any dirt from the coffee boiler and the instant boiler.
– wash your hands carefully
– prepare an anti-bacterial cleaning solution with a chlorine base (products
that can be purchased in pharmacies) carefully following the indications
on the product instruction labels.
– remove all the product containers from the distributor (Fig.4.16)
– remove the lids from the product containers covers and product chutes
(Fig.4.17). Dip all in the solution previously prepared
– remove all the powder chutes, water funnels, mixing bowls and whippers
and silicone tubes and dip these parts also in the prepared solution
(Fig.4.18)
– with a cloth soaked with the solution clean the whipper assembly base
(Fig.4.19)
– the parts must soak in the solution for the time indicated on the solutions'
instruction label.
– Recover all the parts, rinse them abundantly, dry them perfectly and
proceed with the re-assembly in the distributor.
For further safety after the assembly of the parts, effect some auto-
matic cleaning cycles so as to eliminate any eventual residues.
4.5.4 Payment system installation
The distributor is supplied without any payment system:
The installation of the payment system is the responsibility of the installation
technician.
Bianchi Industry spa will not take responsibility for any eventual damage to
the machine itself and/or to things and/or persons due to incorrect installation.
– remove the board and coin mechanism protection door (Fig. 4.20)
– Connect the payment system (Fig.4.21) to the Master board.
The selectors must be directly connected to the Master board the and the serial
executive systems through the interface cable supplied with the machine.
Then go into programming for the correct settings.
Consult chapter" 5.0
SOFTWARE
the parameters, that must be coherent with the system used.
Check the payment system connections, by consulting the diagram of the
sheet shown.
– Hook the coin mechanism (Fig. 4.22).
4.6 Product container loading (with machine off)
4.6.1 Loading containers
– It is advisable to remove each container when it needs to be filled.
Particularly, for the coffee bean container, it is necessary close the chute
door before removing the container (Fig.4.23).
– remove the covers of each container and load the product according to
the product indicated on the label (Fig.4.24)
– pay attention that they there are no clots, avoid pressing the product
and using an excessive quantity, so as to avoid its aging in relation to the
consumption forseen in the time period between two loadings.
Check the container product capacity in the section TECHNICAL CHARACTE-
RISTICS.
4.6.2 Cup loading
Use only cups suitable for automatic vending machines,
features by consulting the chapter 1.0 "Technical Specifications."), avoid
compressing the cups between
rotate the turret manually.
First filling
In installation phase with the cup dispenser completely empty, operate as
follows:
– Check that the cup column is not aligned with the distribution outlet,
then fill all the columns proceeding in an anti-clockwise sense, opposite
sense (when the column is aligned with the distribution outlet), close
the door and switch on the machine so that the cup column rotates and
automatically places itself in a position in which it is not aligned with the
inlet and then proceed to fill (Fig.4.25)
– Put the cup turret's lid back on and snap in the spring band (Fig. 4.26).
Normal filling
The cup column should normally filled with the machine off, simply by opening
the front door, lifting the lid and inserting the missing cups.
INSTRUCTIONS" so as to verify setting of
(check the relevant
themselves during the loading. Don't try to
4.6.3 Spoon loading
Attention! Only use appropriate stirers to be used in automatic vending
machines.
– Remove the metal weight from the spoon dispensing column (Fig. 4.27)
– insert the spoons with their pack wrapping in the column and when they
are positioned on the bottom cut and remove the wrapping (Fig. 4.28)
– once the loading is completed put the weight back in the spoon dispensing
column.
– Check that the spoon are cut burr-free, that they are not bent and that
they are all placed horizontally (Fig.4.29).
4.6.4 Insertion of waste grounds bag
– insert the plastic bag wrapping it on the support itself (Fig. 4.30)
– Use plastic bags that are sufficiently long so that they touch the bottom
of the distributor.
-
Make sure that the liquid collection tank is in the correct position and
periodically empty it.
4.7
FIRST SELF INSTALLATION MODE
At the first machine start up will be performed a self installtion .The aim
of this procedure is to avoid the manual connections of wires on the boards
after the filling of the Hydraulic cyrcuit.
For Espresso single boiler:
When the distributor is started up the airbreak is filled with water.
When the floater is in the upper position the machine will start loading water
automatically and this will go on until 200cc of water are counted by the fan
(then water will be supplied via a mixer throughout the procedure).
The procedure will be carried out with resistance off.
At the end a date will be shown on the display.
For Espresso Double boiler
When the distributor is started up the airbreak is filled with water.
When the floater is in the upper position the machine will start the automatic
installation process and following loading of both boilers (then water will be
supplied via a mixer and by the 3-way Coffee EV throughout the procedure).
The procedure will be carried out with resistance off.
At the end a date will be shown on the display.
For Instant boiler :
When the distributor is started up the airbreak is filled with water.
When the floater is in the upper position at least for 5 consecutive seconds
the machine will open an instant electrovalve and start a water loading
cycle in the boiler (then water will be supplied via a mixer throughout the
procedure)
The procedure will be carried out
with resistance off.
At the end a date will be shown on
the display.
Now we must enter the installation date using the push button panel as
shown below:
Mod. LEI400
- Lei600
Pushing the ENTER BUTTON, the
machine will wait for 10 seconds
then will start to warm up the
boiler.
The date will be recorded on the
board.
To restore the first installation
mode, go to Programming using
Password 22933.
21
ENGLISH
16 / 02 / 2017
INCREASE VALUE
DECREASE VALUE
MOVE CURSOR
ENTER /
SCROLL OPTIONS
ESCAPE