Descargar Imprimir esta página

Hayward ENERGY LINE PRO Manual De Instalación E Instrucciones página 44

Ocultar thumbs Ver también para ENERGY LINE PRO:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
3. INSTALLATION AND CONNECTION (continued)
Do not position the device directly on the floor because this could
cause problems.
Favour positioning on the ground on anti-vibration studs.
A wall bracket must not be used in conditions that can transmit
vibrations.
Do not install the heat pump on a support that risks intensifying the
unit's vibrations.
Do not install the heat pump anywhere liable to amplify its noise level or
anywhere where its noise could disturb neighbours.
Do not use adhesives: the latter are not considered to be a reliable
means of fastening.
Preferably, install the heat pump on a flat and dissociated cement block.
Set up the unit on the supplied rubber bushing (fastenings and washers
supplied).
Fasten the device, in compliance with the tightening indicated to avoid
any risk of accident or damage to equipment and persons.
Another possibility: install the heat pump on rubber floor supports
using suitable fastenings (not supplied).
The maximum installation distance between the unit and the swimming
pool is 15 metres.
The total length of the piping to and from the unit is 30 metres.
Insulate both the above ground and buried hydraulic piping.
The heat pump must be installed at a minimum distance from the pool
in compliance with NF C 15-100 (3.5 m from the water for France) or in
compliance with installation standards applicable in other countries.
Do not install the heat pump close to a heat source.
For installation in snowy regions we recommend sheltering the machine
to avoid snow accumulating on the evaporator.
8
5-7 N.m
x 4

Publicidad

loading