Descargar Imprimir esta página

ELICA EORX36SS Instrucciones De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation instructions
1. Determine installation heigh according your hood installation
manual information and trace a baseline at the selected
mounting heigh on the wall.
2. Trace a vertical centerline over the baseline.
3. Place the template on the
wall and align the baseline
and centerline, tape it.
NOTE: If installing at 8 feet, the
ceiling template should be positioned
to match the centerline of the wall
template against the centerline of the
ceiling template (both templates have
a cutout area for mounting).
4. Draw the propper holes for horizontal and vertical supports
considering your cabinet model and remove template.
5. Drill ³⁄₁₆" (4.8 mm) pilot holes at marked locations.
6. Place the vertical supports on the wall and fix each with 4 - 5.4
x 75 mm screws using 10 x 50 mm anchors.
7. Place the horizontal
support on the wall
and fix with 10 - 5.4 x
75 mm screws using 10
x 50 mm anchors.
NOTE: If installing
at 8 feet, use ceiling
bracket.
A. Horizontal brackets
B. Ceiling bracket
8. Using 2 or more
people, lift the hood
insert near the cabinet
sliding it from below
the supports.
9. Place the hood insert near its mounting position and run the
power supply cable through the strain relief into terminal box
(enough to make connection).
10. Tighten the strain relief screws.
11. Remove hood metal grease filters.
12. Place the hood insert under the horizontal support.
13. Fix the hood insert to
the horizontal support
with 4 - 6 x 16 mm
screws and 4 clip nuts.
14. Only for ETRXXXXX
hood models unscrew
and remove hood
insert rear bracket
support that will be
attached to the back
of the cabinet
A. Screws
A
B
A. Centerline
C. Delimiting cut
B. Baseline
NOTE: Both templates have an area that
delimits the ceiling from the wall, cut out
depending on the model of your hood.
B
A
15. Only for ETRXXXXX hood models attach hood insert rear
bracket support with 4 - 3.5 x 9.5 mm screws on the back.
B
16. Make electrical connection according your hood installation
manual.
17. Unscrew rear and top
screws and remove
both metalic and
wood support rear
brackets from cabinet.
Dispose of this
brackets.
18. Lift the hood cabinet beneath the motor housing. Insert the
cabinet pins into the vertical support slots. Once the eight pins
are already inserted, the cabinet stands hanging.
19. Losen the 4 - 6 x 16 mm screws and slide the hood towards
the front of the cabinet with both hands until it can no longer
be slid. NOTE: The distance between the cabinet and the hood
should be as small as possible.
Tighten the 4 - 6 x 16 mm screws to the clip nuts to secure the
hood.
20. Fix the cabinet to hood insert with 4 - 3.5 x 9.5 mm screws on
each side. Use the following image as a guide.
21. Replace metalic grease filters.
A
A. 4 - 3.5 x 9.5 mm
screws
B. Rear bracket
2

Publicidad

loading

Este manual también es adecuado para:

Eorx48ssEctx36ssEctx48ss