Filling and venting the heating tank
1. Close the boiling water tap.
2. Open the mains valve.
3. Open the boiling water valve to fill in the tank until water flows out from the tap.
4. Wait until water flows from the tap.
5. Let the water flow for 3 minutes until clear water flows from the tap.
6. Check for leaks, rectify as necessary.
The Installation Diagram
Cold Flexi Tail
PVC
Tube
Hot Flexi Tail
Step 3 - Priming and Checking for
Water Tightness
Before the electronic instant hot water
appliance is plugged into the power socket
it must be tested for water tightness and no
leaks.
Open all water valves to allow water to flow
to the instant hot water tap. Turn the spring
back instant hot water handle and hold to
fill the electronic instant hot water appliance
this will take about 2 minutes.
Parts List
NO
Description
G 1/2" male
1
G 1/2" female
2
Flexi Tail
G 3/8" female
Silicone Tube
3
& G 1/2" male
In
Out
G 3/8" female
4
connection
Usage
Picture
Connect with
& PE tube
G 1/2" female
adaptor
hose from tap
Connect to
connection
& PE tube
marked fitting
adaptor
No3
Connect to part
*IN* of boiler
adaptor
Connect to part
& quick
*OUT* of boiler
and connect
adaptor
silicone tube
Packed in
Filter Box
Filter Box
Boiler Box
Boiler Box
MIXER PART:
≤ 5 bar
≤ 70°C
BOILING
WATER PART:
≤ 5 bar
≤ 110°C